5 trains run from Chandrapur to Sir M Visvesvaraya Terminal on Indian Railways. The fastest is SMVT Bengaluru SF Express (22351), taking about 20h 50m; the first leaves Chandrapur at 8:30 AM and the last at 7:45 PM.
| Train | Departs | Arrives | Duration | Runs |
|---|---|---|---|---|
| SMVT Bengaluru Weekly Express (11086) | 8:30 AM | 7:35 AM (+1 Day) | 23h 5m | Saturday only |
| SMVT Bengaluru SF Express (22365) | 3:08 PM | 2:30 PM (+1 Day) | 23h 22m | Daily |
| Sanghamitra SF Express (12296) | 6:50 PM | 4:10 PM (+1 Day) | 21h 20m | Daily |
| SMVT Bengaluru SF Express (22351) | 7:45 PM | 4:35 PM (+1 Day) | 20h 50m | Saturday only |
| Patna - SMVT Bengaluru Humsafar Express (22353) | 7:45 PM | 4:35 PM (+1 Day) | 20h 50m | Friday only |
5 trains run from Chandrapur to Sir M Visvesvaraya Terminal on Indian Railways.
The first train is SMVT Bengaluru Weekly Express, which leaves Chandrapur at 8:30 AM.
The last train is Patna - SMVT Bengaluru Humsafar Express, which leaves Chandrapur at 7:45 PM.
SMVT Bengaluru SF Express (22351) is the fastest, taking about 20h 50m.
Yes — WhereIsTheTrain shows every train's position, expected delay and next stop on a map, free and without signing up.